Spreadsheet App Comparison

Glide vs a Custom App

Glide turns a spreadsheet or table into a working mobile friendly web app in an afternoon, which is ideal for small teams and simple workflows. Tepia builds custom iOS and Android apps, typically in React Native or Swift and Kotlin with offline first sync, when field crews lose signal, data outgrows a spreadsheet, or customers expect an app in the stores.

The essentials at a glance

Glide is the fastest way to put a spreadsheet in your team's pocket; a custom app is for when the spreadsheet should no longer be the database.

dream-app

Afternoon Apps

Tepia often suggests Glide for a ten person team that needs a directory, checklist or simple request form running by next week.

Read: Turn Spreadsheets Into a Custom App
connect-audience

Offline In Field

Tepia builds offline first apps that save inspections, photos and signatures without signal and sync once coverage returns.

Read: Offline First App Development
smart-product

Real Database

A custom app stores records in PostgreSQL with validation and history, so one mistyped cell cannot quietly break every report.

Read: Low Code Platforms vs Custom Development
optimize-ecommerce

Store Presence

Customers find a custom app in the App Store and Google Play, with push notifications and device features they already expect.

The numbers matter.

Figures Tepia considers when a team asks whether a Glide app is still enough.

70%

Low Code App Share

Gartner predicted that by 2025, 70 percent of new applications built by organizations would use low code or no code tools.

91%

Crews With Smartphones

Pew Research Center's 2025 survey found 91 percent of US adults own a smartphone, so most crews already carry the device an app needs.

50

WCAG AA Criteria

WCAG 2.1 has 50 success criteria at Levels A and AA out of 78 in total, the accessibility bar Tepia builds custom apps to meet.

What Glide does well for small teams

Glide connects to a Google Sheet, an Excel file, Airtable or its own Glide Tables and turns the rows into screens: lists, detail pages, forms, maps and buttons that trigger actions. The result runs in a browser and can be added to a phone’s home screen, so there is nothing to submit to an app store. A property manager can have a vendor directory, a maintenance request form and a unit checklist in front of staff the same day. Tepia respects that speed and often recommends Glide to clients for simple jobs.

Glide tends to be enough when:

  • The team is small, connected to Wi-Fi or cell service, and trusted to see most of the data.
  • The underlying data is a few tables that a person could still review in a spreadsheet.
  • The app collects or displays information but does not enforce complicated rules.
  • Nobody outside your organization needs to find it in an app store.

Where spreadsheet based apps start to strain

The strengths of Glide come from its spreadsheet roots, and so do its limits. Tepia hears from teams at the point where one of these becomes a weekly problem:

  • Data quality drifts. Someone sorts the source sheet, pastes over a formula or renames a column, and the app quietly shows the wrong thing. Spreadsheets were never designed to enforce relationships between tables.
  • Crews lose signal. A pest technician in a crawlspace or a landscaper on a rural property needs to finish the job, capture photos and collect a signature with no coverage, then sync later.
  • Devices matter. Bluetooth sensors, label printers, continuous barcode scanning, background location or reliable push notifications push past what a browser based app can do well.
  • Permissions get complicated. Supervisors should see their crews, crews should see only their jobs, and a client should see only their sites.
  • The app becomes customer facing. Customers expect to download your app from the App Store or Google Play, with your brand, fast load times and accessibility built in.

A typical example: a commercial cleaning company starts with a Glide checklist for each building. A year later it has forty buildings, supervisors editing the same sheet from different phones, client complaints tied to rows that were overwritten, and a large client asking for proof that each restroom was serviced on schedule. The app did its job. The spreadsheet underneath it can no longer carry the weight. At that point Tepia usually recommends moving the data into a real database first, then building the app on top of it.

Which jobs suit Glide and which need a custom app

Tepia finds it more useful to compare by job than by feature list. Here is how common requests usually land.

Job to be done Glide fits Custom app fits
Staff directory or contact list Yes Only as part of a larger app
Daily equipment checklist for one site Yes, on reliable Wi-Fi When results feed compliance records or many sites
Field inspections with photos and signatures For light use with good coverage When crews work offline or reports have legal weight
Event or conference guide Yes, for a single event For a recurring branded app with push and accounts
Inventory counts with barcode scanning Small counts, occasional use Continuous scanning, label printing, thousands of SKUs
Customer booking and payments Rarely Yes, with Stripe or Square and PCI DSS scoping
Client portal with private records Simple, low sensitivity data Record level permissions, audit logs, HIPAA aware data

If your request sits in the middle column today but your roadmap points to the right, Tepia can design the data model so the move later is a migration, not a rewrite.

Moving a Glide app to custom without starting over

A Glide app is a useful prototype. It shows which screens people open, which fields they fill in and which ones they skip. Tepia uses it as evidence during Discovery rather than discarding it.

The usual path has three steps. First, the spreadsheet tables become a PostgreSQL schema with required fields, foreign keys and change history, and a script imports existing rows and flags duplicates or broken links for your team to resolve. Second, a Node.js or Firebase backend exposes that data through an API with role based access. Third, a React Native or native Swift and Kotlin app replaces the Glide screens, adding offline sync, camera and device features, and store distribution. Some clients keep a Glide app pointed at a read only export for office staff during the transition.

Related reading: turn spreadsheets into a custom app and offline first app development.

How Tepia approaches Glide and custom app decisions

Tepia runs its standard six phases, scaled to the size of a team that started on Glide.

  1. Discovery: a review of the Glide app, its source tables and their formulas, plus interviews with the people who use it in the field. Deliverables are an Investigation Summary that flags data quality issues, an Interview Summary, and User Stories such as a crew lead closing a job with no signal.
  2. Design: a design questionnaire, moodboards, a style guide and detailed wireframes, tested outdoors for glare and with gloved hands where that applies.
  3. Development and Testing: Alpha and Beta builds with test plans for offline sync conflicts, data import accuracy, accessibility against WCAG 2.1 AA and user acceptance by crew leads.
  4. Training: short hands on sessions, in person or remote, using the User Story scenarios from Discovery.
  5. Launch: final data migration from the spreadsheets, a transition week where both apps run, store submission and support reps on rollout.
  6. Support: issue resolution, bug tracking and feature requests.

Teams coming from Glide often have a short Discovery because the existing app answers many questions. Development and QA typically run 2 to 6 months, and launch about a month. Read our process or talk to Tepia.

Frequently asked questions

Is Glide good enough for our field team, or do we need a custom app?
Glide works well for small teams with reliable coverage and simple data. Tepia recommends a custom app when crews work offline, need device features like continuous scanning, or when the data has outgrown a spreadsheet.
Can a Glide app be published in the App Store and Google Play?
Glide apps run in the browser and can be added to a home screen rather than listed in the stores. Tepia builds native or React Native apps when you need store distribution, push notifications and full device access.
Can we keep our spreadsheet data if we move from Glide to a custom app?
Yes. Tepia imports the existing rows into PostgreSQL, flags duplicates and broken links for your team to review, and then keeps the history from that point forward.
Does a custom app work offline better than a Glide app?
Tepia builds offline first apps that store inspections, photos and signatures on the device and sync when signal returns, with rules for resolving conflicting edits.
How long does it take to replace a Glide app with a custom one?
Tepia usually needs a shorter Discovery because the Glide app shows what users rely on, then typically 2 to 6 months of development and QA and about a month for launch.

What Our Customers Say.

A paragraph or two with information on your product/service or describes a problem your product/service is designed to solve.

Jascotina

CEO

“They customized the website’s backend to my business' specific needs and I am absolutely thrilled with the result.”

Water Saver Solutions

Senior Project Manager

"Tepia Co was always willing to go the extra mile for us."

Onward Engineering

VP & Operations Manager

"There are no hidden things, there are no surprises. We know what's going on."

Move your crew off the spreadsheet