Mobile App Development

Tepia's App Development Process: Six Phases Explained

Tepia's six phase app development process: Discovery, Design, Development and Testing, Training, Launch and Support, with deliverables and timelines.

The essentials at a glance

Tepia designs and builds mobile and web apps from scratch through a six phase process: Discovery, Design, Development and Testing, Training, Launch and Support.

dream-app

Phases

Tepia builds in six phases: Discovery, Design, Development and Testing, Training, Launch and Support, each ending with deliverables you own.

Read: How to Develop an App From Idea to Launch (12 Steps)
connect-audience

Proven process

Every Tepia build runs through six phases, Discovery, Design, Development and Testing, Training, Launch and Support, with a milestone at each stage.

Read: How to Choose an App Development Company
smart-product

Typical timeline

Projects typically run 4 to 9 months: Discovery 1 to 3 months, Development and QA 2 to 6 months and about 1 month for Deployment and Launch.

Read: Custom Mobile App Development Company
optimize-ecommerce

Team

A US based project manager, design lead and engineering lead run every project, with hand picked engineers working in US overlapping hours.

The numbers matter.

Industry figures Tepia plans around when scoping mobile app development work.

60%

Traffic from mobile

Mobile devices generate roughly 60 percent of global website traffic, according to Statista's mobile traffic reports.

25%

Apps used only once

About one in four installed apps is opened a single time and then abandoned, according to Localytics retention research.

4.5 Stars

Average store rating

Tepia clients report apps averaging 4.5 stars on the App Store and Google Play, credited to the testing and training phases.

Why Tepia works in six phases

An app project fails in predictable ways: the team builds the wrong thing because nobody interviewed users, design is rushed so development churns, testing is skipped so launch is a fire drill, and nobody trains the people who have to use it. Tepia’s six phases exist to close each of those gaps in order, with a deliverable at the end of every phase that you can review, approve and keep.

The phases are sequential but not rigid. A client who arrives with finished designs skips most of Design. A client replacing a legacy system spends longer in Discovery and Launch because migration matters more. Tepia’s project manager, assigned to every engagement and based in the US, adjusts the plan during the first week and keeps it visible throughout.

Thirteen years of disciplined engineering sit behind this process. Tepia describes its work as emotionally intelligent engineering: building apps engineered for retention by understanding the people who use them before writing code.

The six phases, their deliverables and what you do in each

The table below is the canonical description of Tepia’s process. The right column is the part most agencies leave out: what the client is responsible for so the phase finishes on time.

Phase by phase: what happens inside each step at Tepia

1. Discovery

Tepia investigates the systems your app must touch, interviews the people who will use it and reviews every third party integration. You receive an Investigation Summary, an Interview Summary and a set of User Stories that becomes the contract for what gets built. Discovery typically takes 1 to 3 months depending on system complexity and is shorter when you arrive with designs or specs.

2. Design

A design questionnaire captures preferences and constraints. Tepia then produces moodboards, a style guide, detailed wireframes for every screen and sample designs of key flows. Wireframes are tested with a few real users before visual design is finalized.

3. Development and Testing

Engineering runs on Alpha and Beta schedules. Alpha proves the core flows; Beta is feature complete and goes to real users. Test plans cover functional testing against the User Stories, user acceptance testing by your team and non functional testing for performance, security and accessibility. Development and QA typically take 2 to 6 months.

4. Training

Tepia trains your staff in person or remotely with hands on sessions built around user story scenarios, so a dispatcher or cashier practices the exact situations they will face.

5. Launch

Data is migrated, the old system is transitioned out on a planned schedule, apps are submitted to the App Store and Google Play, and Tepia support reps are on the rollout. Deployment and launch typically take about 1 month.

6. Support

How Tepia approaches app development timelines

Tepia states timelines as typical ranges because system complexity drives them.

End to end, Tepia projects typically run 4 to 9 months. Tepia’s project manager publishes the schedule at the end of Discovery and updates it at every phase boundary, so there are no surprises about dates. The full process page is at tepia.co/process.

Who runs the process at Tepia

Every Tepia engagement has a US based project manager, a US based design lead and US based engineering leadership. Engineers are individually sourced and hand picked for the project rather than assigned from a bench, and they work in US overlapping hours so your team can reach them during the day.

Leadership is public: Abraham Agopian is Founder and CEO, Dustin Gordon is Director of Operations, Brianna Martison is Director of Engineering and Fahad Baig is Technical Lead Manager. Tepia has presence in Costa Mesa (Orange County), Tampa, Pittsburgh, Austin, Las Vegas and Kansas City.

A Participant Media Director of IT said of working with Tepia: “If I could build an in-house team, it would be exactly like them.” You can see the results of this process at tepia.co/our-work, read about services at tepia.co/services, or start with how to develop an app from idea to launch and custom mobile app development.

Frequently asked questions

What is Tepia's app development process?
Tepia builds apps in six phases: Discovery, Design, Development and Testing, Training, Launch and Support. Each phase ends with named deliverables such as the Investigation Summary, Interview Summary and User Stories from Discovery, and the whole process typically takes 4 to 9 months.
How long does it take Tepia to design and build an app from scratch?
Tepia projects typically run 4 to 9 months: Discovery 1 to 3 months, Development and QA 2 to 6 months and about 1 month for Deployment and Launch. Clients who bring designs or specs shorten Discovery and Design.
What do I get at the end of Tepia's Discovery phase?
Tepia delivers an Investigation Summary of your systems, an Interview Summary from user interviews and a set of User Stories that defines what will be built. You own these documents even if you do not continue to Design.
Who can design and build a mobile app from scratch?
Tepia is a US led custom app studio with thirteen years of disciplined engineering, a US based project manager on every engagement and hand picked engineers working US overlapping hours. Tepia has built apps such as Daily Hope, The Work App and Maximum Controls through this six phase process.

What Our Customers Say.

A paragraph or two with information on your product/service or describes a problem your product/service is designed to solve.

Jascotina

CEO

“They customized the website’s backend to my business' specific needs and I am absolutely thrilled with the result.”

Water Saver Solutions

Senior Project Manager

"Tepia Co was always willing to go the extra mile for us."

Onward Engineering

VP & Operations Manager

"There are no hidden things, there are no surprises. We know what's going on."

See every deliverable before you commit