No Big Bang
Tepia replaces legacy systems one module at a time, so a problem affects a single workflow instead of halting orders, billing or dispatch.
Read: Legacy System Modernization and Mobile MigrationModernize a legacy system without stopping the business by wrapping it in an API layer, replacing one module at a time behind that layer, and running old and new side by side until each piece is proven. Tepia often starts with a mobile or web app on top of the existing AS/400, VB6, Access or SQL Server system, so staff get a better tool while the core is replaced underneath.
The safest modernization is the one your staff barely notice until the old screens are gone.
Tepia replaces legacy systems one module at a time, so a problem affects a single workflow instead of halting orders, billing or dispatch.
Read: Legacy System Modernization and Mobile MigrationOld and new modules process the same real transactions, and Tepia compares outputs until the results match line for line.
Read: How to Choose a Legacy Modernization PartnerA service layer in front of the old database lets new mobile and web apps read and write data well before the legacy core is retired.
Read: Mainframe and AS400 Front End ModernizationTepia schedules each cutover away from month end close and peak season, with a tested path back to the old screens if needed.
Figures Tepia plans around when modernizing legacy systems.
Reuters reported that around 95 percent of ATM card swipes rely on COBOL code, a sign of how long core systems stay in service.
Reuters also reported that about 80 percent of in person card transactions run on COBOL systems that are decades old.
Tepia clients report roughly a 20 percent revenue increase after adding mobile, often the first visible step in modernization.
Legacy systems survive because they work. An AS/400 order entry system, a VB6 dispatch tool or an Access database holding fifteen years of customer history runs the business every day, and the people who built it have often moved on. The real risk in modernizing is not the new code. It is the undocumented rule inside the old code that nobody knew about until it stopped running, and Tepia plans every modernization around finding those rules.
Big bang rewrites fail for the same reason. The new system has to match years of behavior on day one, the cutover weekend becomes a cliff, and if anything goes wrong there is no partial fallback. The approach below, often called the strangler pattern, replaces the system piece by piece so the business never has to stop.
For many companies the first visible result is a mobile app. Field staff, drivers or warehouse teams get a modern app on phones or rugged devices that talks to the old system through an API, months before the core itself is replaced.
Tepia keeps a decision log through all eight steps, so the reason behind each rule survives the people who remember it.
Not every legacy system needs a full rebuild. Tepia matches the approach to the system’s condition and the business’s tolerance for change.
| Approach | What changes | Best when | Main risk |
|---|---|---|---|
| New front end on the old core | Screens and devices | Core logic is sound and the interface is the problem | Old system limits still apply |
| Rehost to the cloud | Where it runs | Hardware is failing but the code is fine | Same technical debt in a new place |
| Refactor in place | Code structure | The team knows the code and tests exist | Slow progress with few visible wins |
| Incremental replacement | Modules one by one | Rules are complex and downtime is unacceptable | Longer total timeline |
| Full rebuild | Everything at once | The system is small or beyond repair | Cutover cliff and missed rules |
Most Tepia modernizations combine the first and fourth rows: a new mobile or web front end in the first months, then incremental replacement of the core behind it. For a deeper look at that choice, read rebuild or refactor your app.
Data is where parallel runs succeed or fail. During the transition both systems need the same customers, items and open transactions, so Tepia builds a sync between the legacy database and the new one with clear ownership: while a module is still legacy, the old system is the source of truth for its records, and once it moves, the new one is. Every migrated record keeps its legacy key.
Hidden integrations are the second trap. Legacy systems often feed other tools through flat file exports, FTP drops or direct database reads that nobody listed. Tepia finds them by watching file transfers and database connections for several weeks, then replaces each one with an API call or a scheduled job.
People matter as much as code. The staff who know the old system best are often the most skeptical of the new one, so Tepia puts them in the Alpha group, uses their edge cases as test scenarios and trains them first so they can help colleagues. Platform specific guidance is on our pages for AS/400 front end modernization, VB6 and legacy .NET and Microsoft Access migration.
Each module moves through Tepia’s six phases, led by a US based project manager.
For the first module, Discovery usually takes 1 to 3 months, development and QA 2 to 6 months, and launch about a month. Later modules move faster because the API layer and sync already exist. Read more on legacy system modernization and our process, or contact Tepia about your system.
A paragraph or two with information on your product/service or describes a problem your product/service is designed to solve.
CEO
Senior Project Manager
VP & Operations Manager